How to Plan Flexible Batch-Split Delivery Under a Long-Term Annual Frame Contract for Adult Incontinence Products

How an annual frame contract fixes the specification while each batch stays flexible, and how to split a year's volume without breaking product consistency

Quick Answer for Buyers

Quick answer: Batch-split delivery separates what is fixed from what is flexible. An annual frame contract locks the approved specification and the quality agreement for the year, while each batch sets its own quantity and delivery window against a rolling forecast. This lets a buyer smooth inventory and respond to sell-through without renegotiating the product. ASL Group (Shandong Aishule Hygiene Products Co., Ltd., whose history dates back to 1998) operates more than 130 fully-servo high-speed production lines and can shift production between our China and Malaysia facilities to help maintain schedule for annual split-batch orders.

What the Frame Contract Fixes vs. What Each Batch Sets

ElementFixed by the annual frameSet per batch
SpecificationApproved construction and materialsUnchanged across every batch
Quality agreementInspection and release thresholdsApplied to every batch
QuantityAnnual volume intentSplit per batch against sell-through
Delivery windowArrival plan for the yearConfirmed per batch in the order

Two things make a batch split work in practice: a specification that is truly locked, and a forecast that is updated rather than filed. If the specification drifts between batches, the split becomes a quality problem disguised as a logistics one; if the forecast is filed once and never revisited, the split becomes an overstock problem disguised as a plan. The buyer therefore keeps the specification stable and keeps the forecast current, and the supplier turns each confirmed batch into a scheduled run. That mutual discipline is what lets a year of volume move in a rhythm instead of a block.

What ASL Group Provides for Batch-Split Delivery

Compliance Points Buyers Often Miss

Frequently Asked Questions

Can an annual frame contract be delivered in split batches?
Yes. The frame contract locks the specification and quality agreement for the year, while each batch sets its own quantity and delivery window.
What is the minimum quantity per batch?
The batch structure is agreed per project against the approved specification and the annual plan; it is not a fixed figure for every order.
Does splitting the order change the unit price?
Usually the price is not fixed for the full contract term. We set pricing with pre-agreed adjustment triggers such as raw material cost fluctuations and exchange rate changes, reviewed mutually at scheduled intervals.
Are split batches the same product?
Yes. Every batch runs from the same approved specification and quality agreement.
How is the delivery window set?
The arrival plan is set for the year, and each batch's window is confirmed in the final quotation and purchase contract.
How fast can a batch ship?
Expedited production and shipment generally take approx. 45 days. Lead time depends on the approved specification, packaging, order quantity, production base and destination. Shipment window date shall be confirmed in the final quotation and purchase contract, suitable for restock based on a specific mix.

The reason a year of volume is better split than shipped as one block is that the two risks — overstock and stock-out — move in opposite directions and cannot both be answered by a single shipment. A split plan answers them separately: the rolling forecast keeps the stock close to sell-through, and the per-batch window keeps the next shipment arriving before the last one runs out. The frame contract supplies the discipline, and the split supplies the flexibility, so a buyer gets a year's supply that follows demand instead of a year's stock that waits for it.

The practical test is whether the first batch of the year and the last batch are the same product. With one locked specification and a rolling forecast, they are, because the split changes only when and how much ships — never what ships.

A Year's Supply, Scheduled Not Stacked

A buyer does not need a warehouse full of a year's stock; it needs the stock to arrive as sell-through asks for it. With this approach, our more than 130 lines and our four global production bases turn an annual frame contract into a delivery rhythm that follows demand rather than a single shipment that waits for it.

Agree Your Batch-Split Plan

Send the annual volume intent, the target markets and the restock rhythm. ASL returns a batch-split plan — locked specification, rolling forecast and per-batch windows — for confirmation before the first shipment.

More FAQs

Contact Aishule Hygiene Products